
The pool stayed where it was – everything else is new
A complete pool renovation in Greiling: new foundation, natural stone laid in Roman bond and seating stones in Jura limestone – built in six months.
| Location | Greiling near Bad Tölz |
| Size | Pool renovation with new surroundings (2021) |
| Design | Valentin Sommer (site management) |
| Implementation | Fuchs baut Gärten GmbH – Gärtner von Eden |
| Photography | – |
Not every pool we build is new. This one in Greiling near Bad Tölz was already there – and had reached the end of its life. So we stripped it right back to the base: 33 cubic metres of old concrete foundation removed, the old liner disposed of. Then the rebuild: a new foundation slab with ring beam, a brick-built shaft for the counter-current system, and a cistern too.
None of that is visible today – and that is exactly the point. What you see is the light natural stone slabs in a large Roman bond around the pool, the Jura limestone seating stones that frame the water as a 17-metre seating wall, a mortared quarry stone wall and large granite block edging. Add to that a young hedge of seventeen large thuja specimens and 250 m² of turf – built in six months, from January to July 2021.
A pool renovation is the ultimate discipline in working with existing structures: the new has to suit what has grown over time, from the old fruit tree to the hedge. More on the different pool types: Water in the garden.









Photos: –
Let's talk about your project
We are happy to advise you in person, with no obligation.
Request a consultation